The “Need for Speed” in Solving Flood Control and Resiliency Challenges

THE STORMWATER PROBLEM As demonstrated by the severe flooding in the Northeast U.S. this past month, the problems associated with increased storm intensity, undersized systems, and deteriorating infrastructure are rapidly intersecting in a perfect storm. I was stunned to see [...]

Streamlining the Federal Environmental Review Process – Building on The Lessons Learned from FAST-41

In order to begin in earnest, the much needed renewal of America’s water, transportation and energy infrastructure, the Federal Government needs to double down further on its efforts to streamline its Environmental Permitting Process. Title 41 of the Fixing America’s Surface Transportation Act [...]

By |2021-05-12T00:54:26+00:00May 12th, 2021|environmental, streamlining|Comments Off on Streamlining the Federal Environmental Review Process – Building on The Lessons Learned from FAST-41
Go to Top